The scope of work included constructing a state-of-the-art facility designed specifically for sterilizing medical instruments and equipment.
The scope of work included:
- Building out a new 4,000 SF sterile processing department within the existing hospital infrastructure
- Installing all necessary air handling equipment to service the space exclusively, including HVAC systems and air purification systems
- Constructing specialized rooms for sterilization, packaging, and storage of medical instruments and equipment
- Installing advanced technology for monitoring and controlling temperature, humidity, and air flow within the facility
- Implementing a comprehensive plan for maintaining sterility and preventing contamination throughout the department